I think Bert did a beautiful job tiling!
We went with large white porcelain subway-like tiles with small marble tiles to accent.
The corner shelves give lots of room for soap, shaving, and eventually baby stuff.
All in all, the project took from March (after Wassinks moved out) through September. We think that's not so bad considering the changes made in the yard this summer, and our general dislike to do house projects during the beautiful months of summer.
No comments:
Post a Comment